The project comes through its opening design stage. Each of the plots rates something between 10 and 200 thousand square meters. Each comes with power supply, potable and industrial water supply, and gas supply laid on.
Investors shall benefit up-and-running land pieces of already sorted out industrial land rate, and to make the deal more lucrative, it all comes in a full-package expert care and advising on tailor made schemes for each investor to enjoy. All opening green lights are in the bag for starting up construction engineering and industrial facilities along the lines of leasing back-up with the pump primed by way of bank financing agreed with the contractor company. Besides, the zone is to supply ready-to-hand industrial facilities of fresh construction to let or purchased by investors.
To wait for the investors hand and foot the zone shall see to the execution of a concrete works and structures production facility as well as an inert materials processing facility before end of 2006.
The zone provides the basis for a cocktail of production and processing startups to proceed in line with the national legislation and environment-related regulations the output of which suggests to quite a bit meet the demand on both national and cross-boarder level. Bulgarian and foreign investing alike shall have the upper hand in the high-tech productions.